Pre-Startup Safety Review(PSSR) Checklist

https://eauditor.app/
Pre-Startup Safety Review(PSSR) Checklist
Section 1: Electrical
1. 1. Is the machine wired according to code? (National Electric Code, National Fire Protection Association)
Yes
No
N/A
2. 2. Is the machine grounded?
Yes
No
N/A
3. 3. Is the power supply correctly fused and protected?
Yes
No
N/A
4. 4. Will additions or modifications require an Arc Flash analysis?
Yes
No
N/A
5. 5. Are all electrical connections secured, cords only the length necessary, conduit only used where required (no cords running through walls, under doors, etc)?
Yes
No
N/A
6. 6. Is there any temporary equipment S/O cord (allowed for only 90 days) if any follow up required?
Yes
No
N/A
Section 2: Personal Protective Equipment (PPE)
1. 1. Has PPE Hazard Analysis been conducted for new jobs?
Yes
No
N/A
2. 2. Is required PPE available and issued to operators?
Yes
No
N/A
3. 3. Have operators been properly trained in the use and care of required PPE?
Yes
No
N/A
Section 3: Noise
1. 1. Have appropriate measures been taken to safeguard workers against noise hazards?
Yes
No
N/A
2. 2. Has an area survey been conducted?
Yes
No
N/A
3. 3. If noise is above 85 dB, has noise reduction measures been considered?
Yes
No
N/A
Section 4: Evacuation/Egress
1. 1. Have existing means of egress been obstructed or changed (at least 28")?
Yes
No
N/A
2. 2. Have exit routes been rerouted if necessary?
Yes
No
N/A
3. 3. Have employees been trained in new exit routes?
Yes
No
N/A
4. 4. Has the emergency evacuation drawing been updated?
Yes
No
N/A
5. 5. Is head room at least 7 feet high with no overhead obstructions below 6'8"?
Yes
No
N/A
6. 6. Have all emergency exits been designated by appropriate signage/lighting?
Yes
No
N/A
7. 7. Are new sprinkler systems operational and tested?
Yes
No
N/A
8. 8. Fire Extinguisher accessible and adequately marked?
Yes
No
N/A