Section 1: Pre-Drywall Inspection
1. 1. Have all walls been checked for plumb and square?
Yes
No
N/A
2. 2. Have bowed and twisted studs been checked for?
Yes
No
N/A
3. 3. Have all blocking elements, including ADA handrails, cabinets, balcony rails, stair rails, etc., been checked?
Yes
No
N/A
4. 4. Have all draft stop vertical and horizontal elements been checked?
Yes
No
N/A
5. 5. Has the subfloor been checked for damage and/or soft spots?
Yes
No
N/A
6. 6. Have approved point load locations been confirmed?
Yes
No
N/A
7. 7. Has the material for fire ratings and sill treatment been confirmed?
Yes
No
N/A
8. 8. Have door and window locations/opening sizes been confirmed and coordinated with the floor thickness system?
Yes
No
N/A
9. 9. Have windows been checked for proper installation and ease of operation?
Yes
No
N/A
10. 10. Have ADA/ANSI unit requirements and dimensions been confirmed?
Yes
No
N/A
11. 11. Has the proper installation of structural hardware, including hangers, straps, anchors, bolts, CLP, compression post, etc., been confirmed?
Yes
No
N/A
12. 12. Have header and beam locations, type, and installation (cripples and king studs) been confirmed?
Yes
No
N/A
13. 13. Have wall types, sheer wall locations, and construction been confirmed?
Yes
No
N/A
14. 14. Has the building been cleaned and swept?
Yes
No
N/A
15. 15. Is the framing inspection complete, both by the city official and the structural engineer?
Yes
No
N/A
16. 16. Are all walls straight-edged and planed?
Yes
No
N/A