Project Commissioning Checklist

https://eauditor.app/
Project Commissioning Checklist
Section 1: Valuable Elements
1. 1. Has the owner been assisted in evaluating the facility's requirements regarding energy conservation, indoor environment, staff training, and operation and maintenance prior to the design phase?
Yes
No
N/A
2. 2. Are all phases of design and construction documents reviewed for compliance with design criteria, commissioning requirements, bidding issues, construction coordination, installation concerns, performance aspects, and facilitation of operations and maintenance, including training and documentation?
Yes
No
N/A
3. 3. Have the equipment submittals been reviewed for compliance with commissioning requirements?
Yes
No
N/A
4. 4. Are the scheduling and the procedures used for system start-up verified or managed?
Yes
No
N/A
5. 5. Is it verified that the training for the owner’s operating staff is conducted in accordance with the project documents?
Yes
No
N/A
6. 6. Have the operations and maintenance manuals been verified to comply with the contract documents?
Yes
No
N/A
7. 7. Is the owner assisted in assessing the systems’ performance and addressing related issues prior to the expiration of the construction contract warranty?
Yes
No
N/A
Section 2: Success Factors
1. 1. s a backcheck performed during the system selection and concept phase?
Yes
No
N/A
2. 2. Are the Design Development (DD) Documents referred to, including a backcheck of system selection and concept comments?
Yes
No
N/A
3. 3. Are the Mid-Construction Documents (CD) referred to, including a backcheck of DD review comments?
Yes
No
N/A
4. 4. Is it assured that the Owner’s Project Requirements (OPR) and Basis of Design (BOD) are being followed?
Yes
No
N/A
5. 5. Are the specific requirements described in the Owner’s Project Requirements (OPR) addressed and verified?
Yes
No
N/A
6. 6. Is it ensured that the unique project circumstances are not overlooked?
Yes
No
N/A
7. 7. Is the contractor assisted in completing the project correctly the first time, improving the efficiency of the construction and commissioning process?
Yes
No
N/A
8. 8. Is it assured that systems and equipment are maintainable, can be commissioned, and are ready for functional testing?
Yes
No
N/A
9. 9. Is the owner made aware of and supportive of the benefits and process, with sufficient field observations included in the commissioning scope of work?
Yes
No
N/A
10. 10. Does the entire team have a proper understanding of the scope of services, benefits, and schedule implications?
Yes
No
N/A