Pre-Drywall Inspection Checklist

https://eauditor.app/
Pre-Drywall Inspection Checklist
Section 1: Pre-Drywall Inspection Checklist
1. 1. Has the electrical inspection been performed and approved?
Yes
No
N/A
2. 2. Are all the nail plates correctly installed?
Yes
No
N/A
3. 3. Has the fire protection been installed around all conduit/MC cables above ceilings and walls?
Yes
No
N/A
4. 4. Is all the gypsum board in fire-rated partitions, due to electrical conduit/MC cable installation, free from damage?
Yes
No
N/A
5. 5. Is all blocking used by subcontractors complete?
Yes
No
N/A
6. 6. Do all boxes have the proper support ears for the partition type they are in, secure, and in the right location?
Yes
No
N/A
7. 7. Has the plumbing inspection been performed and approved?
Yes
No
N/A
8. 8. Have all the water lines been tested?
Yes
No
N/A
9. 9. Has fire protection been installed around all plumbing lines above ceilings in fire-rated partitions?
Yes
No
N/A
10. 10. Are all plumbing lines strapped correctly?
Yes
No
N/A
11. 11. Are all nail plates correctly installed?
Yes
No
N/A
12. 12. Is all gypsum board in fire-rated partitions, due to piping installation, free from damage?
Yes
No
N/A
13. 13. Is any and all blocking used by subcontractors correctly installed?
Yes
No
N/A
14. 14. Has the sprinkler inspection been performed?
Yes
No
N/A
15. 15. Have all penetrations through fire-rated partitions above ceiling level had fire protection installed?
Yes
No
N/A