AHU Commissioning Checklist

https://eauditor.app/
AHU Commissioning Checklist
Section 1: Installation Verification
1. Is the AHU installed according to the manufacturer's specifications?
Yes
No
2. Are all electrical connections secure and properly insulated?
Yes
No
3. Is the AHU mounted on a stable and level surface?
Yes
No
4. Are all duct connections properly sealed?
Yes
No
5. Is the condensate drain line installed correctly?
Yes
No
6. Are all access panels installed and secured?
Yes
No
7. Is the unit free from any shipping materials or debris?
Yes
No
8. Are the filters installed correctly and in good condition?
Yes
No
9. Is the airflow direction marked and followed?
Yes
No
10. Are safety guards in place for moving parts?
Yes
No
Section 2: Air Handling Unit (AHU) commissioning checklist
1. Is the AHU equipped with the correct size and type of filters?
Yes
No
2. Are all sensors and controls calibrated and functioning properly?
Yes
No
3. Is the fan rotation direction correct?
Yes
No
4. Are all safety interlocks operational?
Yes
No
5. Is the unit properly grounded?
Yes
No
6. Are all drain pans sloped correctly for proper drainage?
Yes
No
7. Is the insulation on ductwork intact and properly installed?
Yes
No
8. Are all service valves accessible and labeled?
Yes
No
9. Is the airflow measured and balanced according to specifications?
Yes
No
10. Are all components free from rust or corrosion?
Yes
No
11. Is the unit operating within the specified temperature range?
Yes
No
12. Are all labels and markings on the unit clear and legible?
Yes
No
13. Is the unit's sound level within acceptable limits?
Yes
No
14. Are all components securely fastened and free from vibration?
Yes
No
15. Is the AHU's performance documented and verified?
Yes
No